Cido Arena, Panevėžys, Lithuania, 2008
Cido Arena – Panevėžys universal sports arena that accommodates up to 7,000 spectators. The Oval building near the centre of the city was raised during the year.
The building is equipped with Comfort Heat roof ice and snow melting system; an electric floor heating system is installed in the changing rooms.
Project scope:
Rainwater drainage system length: 580 m,
Changing rooms floor heating area: 26 m²
Output: 18/36 W/m, 160 W/m²
Total output: 15,8 kW
Products:
CTAE-160 heating mats – 7 pcs. ,
Gte2 self-regulating heating cable – 650 m,
C501 thermostats – 7 pcs.,
ETR2- 1550 thermostats – 2 pcs. ,
ETOR-55 roof sensor – 2 pcs.,
ETF-744 temperature sensors – 2 pcs.