Administration and logistics center for Apranga group in Vilnius, Lithuania, 2017
In 2017 the Apranga group administration and logistic center was built. Administration and logistics center has 3-floor building and makes up 15.400 m² in total. Comfort Heat roof ice and snow melting system is installed in the center.
Project scope:
Rainwater drainage system length – 360 m,
Output: 18/36 W/m,
Total output: 6,6 kW.
Products:
GTe-2 self-regulating heating cable – 368m,
ETR2-1550 thermostats – 2 pcs.,
ETOR-55 roof sensors – 2 pcs.,
ETF-744/99 temperature sensors – 2 pcs.