Administration and logistics center for Apranga group in Vilnius, Lithuania, 2017

In 2017 the Apranga group administration and logistic center was built. Administration and logistics center has 3-floor building and makes up 15.400 m² in total.  Comfort Heat roof ice and snow melting system is installed in the center.

 

Project scope:

Rainwater drainage system length – 360 m,

Output: 18/36 W/m,

Total output: 6,6 kW.

 

Products:

GTe-2 self-regulating heating cable – 368m,

ETR2-1550 thermostats – 2 pcs.,

ETOR-55 roof sensors – 2 pcs.,

ETF-744/99 temperature sensors – 2 pcs.